Basic details of the Project for Supporting AGV&AMR Solutions
No. | Classification | Project site details | Descirptions | Note |
---|---|---|---|---|
1 | Project site condition | Project site layout .dwg file | ||
2 | The condition of each line requires materials ( and the job per hour details ) | |||
3 | Area where moving robot can be allowed to pass | |||
4 | Is there oil on the ground? | |||
5 | Slope condition of existing road surface | |||
6 | Condition of obstacles on the route | |||
7 | Road surface flatness | |||
8 | Whether the route passes through the outdoor | |||
9 | Whether the pavement is cement or paint, how smooth is it? | |||
10 | Warning location | |||
11 | Other supplementary information | |||
12 | Jobs per hour | The number of production lines and total demand for goods (Job per hour) | ||
13 | The positions and the number of loading point and unloading point | |||
14 | Time cost of each delivery of each loading and unloading point from the line | |||
15 | The maximum time allowed for a single loading and unloading (in terms of maximum) | |||
16 | Loading and unloading methods (forklifts, manuals, automatic roller tables, etc.) | |||
17 | Other supplementary information | |||
18 | Material container | Dimensions, structure details and total weight of a single material (including meterial pallet, or box, etc), since these details determine the model of the AGV/AMR | ||
19 | Do you need to provide material trolley or material container design? | |||
20 | Other supplementary information | |||
21 | AGV / AMR parameters | Moving robot speed (average) | ||
22 | Whether you need to have a back function | Ordinary moving robot can only go forward and not backward | ||
23 | Moving robot maximum carrying weight (or total weight if multiple trolleys are included) | Confirm the important basis for moving robot type selection | ||
24 | Endurance at one full charge of the battery | |||
25 | Do you need a remote control? | The remote control can have functions such as starting, stopping, etc. | ||
26 | Special requirements for safety | |||
27 | Need moving robot operation mode (trailer-bearing, latent or towed?) | |||
28 | Other supplementary information | |||
29 | Others | Is there any AGV / AMR or other equipment on the moving robot route? | Consider whether protection is required on the tape or buried under the ground | |
30 | Expected date of completion of the project | |||
31 | Allow moving robot production cycle | |||
32 | Other special control requirements | Such as communication with line-side devices, etc. | ||
33 | Intergrated with WMS, MES, should confirm by both parties. | The robot conrol system should get tasks signal from customer's system such as WMS, MES, etc. | ||
34 | Note1: | Please reflect the actual situation of the above survey. If there is any change or failure to confirm, please also expressly, we will consider it as appropriate. | ||
35 | Note2: | The parameters in terms of size can provide drawings or plan drawings as much as possible. |